We’re — finally — a little bit bigger here at The Red Lion. After a long time, and some very stroppy emails, we’re incredibly excited to open up 6A, properly and permanently.
Huge thanks to everyone who has helped us get here; hopefully it’ll reduce the squeeze a little during busy times. And there’s another toilet, which will reduce another type of squeeze during busy times.
We have a lot of plans for this space in 2026, and a lot of groups interested in using it during the week, from sea shanties to book clubs. If you’re interested in something similar, or have an idea, please let us know as soon as possible.




